Corporate Resume Product Info Testing Articles Updates Contact Us
 
 
Beta Site II:
 

This was a new dental facility with all new dental equipment. Eight dental units were chemically flushed overnight and the Waterclave system was employed on the first treatment day. Sampling of the dental units was performed at 47, 102 and 163 days. All sampled ports performed to the highest expectations with 0 CFUs/ml over this 2 1/2 year time period and upon subsequent testing, no bacterial growth was ever recovered.

 
Copyright 2004 Waterclave® LLC
All Rights Reserved
6731 West 121st Street
Overland Park, Kansas 66209
Tel: 913.312.5860
Fax: 913.312.5861

email: inquiries@waterclave.com